The primary problem in building a wind farm is site selection. The site selection requirements for wind farmsĀ are very strict. Usually, the following points need to be considered: (1) Choose a place with abundant wind resources, the annual average wind speed is above 6m/s, and the wind direction is stable, and measure data such as […]